读知识>英语词典>contract bridge翻译和用法

contract bridge

英 [ˌkɒntrækt ˈbrɪdʒ]

美 [ˌkɑːntrækt ˈbrɪdʒ]

n.  定约桥牌(桥牌游戏的标准形式,只能按叫到的定约取得成局奖分)

牛津词典

    noun

    • 定约桥牌(桥牌游戏的标准形式,只能按叫到的定约取得成局奖分)
      the standard form of the card game bridge , in which points are given only for sets of cards that are bid and won

      英英释义

      noun

      • a variety of bridge in which the bidder receives points toward game only for the number of tricks he bid
          Synonym:contract

        双语例句

        • The Contract D1 of the north approach spans of the 3rd Nanjing Changjiang River Bridge is a continuous box girder structure composed of 3 continuous units, respectively 2 units of 8 spans each and 1 unit of 9 spans.
          南京长江第三大桥北引桥D1标为3联(2联8跨,1联9跨)连续箱梁。
        • The company has won the contract to construct the new bridge.
          这家公司赢得了建造这座新桥的合同。
        • As far as the function of institutions is concerned, the clause of effectiveness of contract violating the mandatory provisions is the bridge and link to connect the public law and private law. Technically, it should be regarded as the general clause of delegating authority to judges.
          从制度功能上说,违反强制性规定的合同效力条款是为连接公法和私法的管道和桥梁;在技术功能上,应当将其视为对法官授权的概括条款。
        • How many firms bid on the contract to build the bridge?
          有多少家公司投标争取那座桥的营造权?
        • Through summary to the construction of Contract 19 Section box arch bridge along Dali-Baoshan Highway, this paper briefly introduces the hoisting method and monitoring control measures of this bridge.
          文章通过对大(理)保(山)高速公路19合同段箱形拱桥的施工总结,简要介绍该桥的吊装方法及监控措施。
        • Installation of Steel Box Girders and Cable-Stays for Main Bridge for Contract B of Junshan Highway Bridge over Changjiang River in Wuhan
          武汉军山长江公路大桥B标主桥钢箱梁安装及斜拉索张挂施工
        • William gallas, who is out of contract next year, also wants to quit Stamford Bridge and has fallen out with Mourinho after reporting late for pre-season.
          明年合同到期的加拉,一心想离开蓝军,在最近发表个人想法后,已经被老穆放弃。
        • The distribution of shallow-buried gas in the Contract Section is introduced and its influence on bridge construction is analyzed. Intended pre-construction gas release through geological drilling and corresponding measures to solved the problems caused by the gas are discussed.
          简述合同段内浅层气的分布情况,分析浅层气对桥梁施工的影响,拟定采取的施工前地质钻孔释放措施,同时针对浅层气在桥梁钻孔桩基础施工中引发问题提出解决措施。
        • Contract is the bridge and link to take economic activities and get economic benefits for the enterprise.
          合同是企业从事经济活动并且取得经济效益的桥梁和纽带。
        • Striker Hernan Crespo has officially left Chelsea after the Argentine's contract at Stamford Bridge expired.
          射手赫尔南·克雷斯波与切尔西的合同到期,并正式离开切尔西了。